• Turbine blade needs repair
    By
     | November 25,2013
     

    LOWELL ó Crews are planning to remove a wind turbine blade on Vermontís Lowell Mountain so it can be repaired after it was hit by lightning.

    A crane will be brought to the mountain so the blade can be lowered to the ground and repaired.

    After it is fixed it will be re-installed on the turbine thatís part of the 21-turbine Kingdom Community Wind complex.

    The Caledonian Record is reports the blade will remain on the ground over the Thanksgiving holiday while the new finish on the blade cures. It will then be reinstalled on the tower.

    The turbines have a lightning protection system and GMP spokeswoman Dorothy Schnure says that without that system, the utility would have had to replace the blade.

    MORE IN Vermont News
    FAIR HAVEN ó Residents will go to the polls Tuesday to vote, for a second time this year, on the... Full Story
    MONTPELIER ó A fragmented Vermont Supreme Court on Friday sided with developers of a major solar... Full Story
    MONTPELIER ó The state has issued a possession permit to an East Montpelier woman to keep a wild... Full Story
    Duck flap settled: Peep can stay
    More Articles
  •  
     
    • MEDIA GALLERY 
    • VIDEOS
    • PHOTOS