• Work to start on Windsor bridge
    April 06,2013
     

    WINDSOR — Construction is starting soon on replacing a bridge in Windsor which will result in some slowdowns on Interstate 91.

    A spokesman for the project’s general contractor said the bridge, which crosses Route 44, was built as part of the original highway construction project between 1958 and 1965. It has passed its design life of 50 years.

    The Valley News reported that the $20.6 million project is being paid for by 90 percent federal funds and a 10 percent state match.

    The southbound span is scheduled to be replaced this year and the northbound bridge will be replaced in 2014.

    Closure of the southbound lanes of the interstate will probably begin at the end of this month. Single-lane traffic also will be expected.

    MORE IN This Just In
    NORTHFIELD — Forbes Magazine has given Norwich University a grade of ‘A'... Full Story
    MONTPELIER A Burlington-based chain of drug-testing labs that has been a key player in... Full Story
    BARRE A former employee of the Phoenix House recovery program has admitted to having sex with a... Full Story
    More Articles
  •  
     
    • MEDIA GALLERY 
    • VIDEOS
    • PHOTOS