TimesArgus.com - We Are Vermont

Pipe inspection continues at VY



Toolbox

The Associated Press
The Associated Press - Published: March 7, 2010

VERNON — Vermont Yankee engineers and technicians are continuing their investigation into the source of a radioactive isotope leaking from the nuclear plant.

Plant spokesman Larry Smith said technicians Saturday continued to use a remote-controlled camera to inspect the advanced off-gas pipe tunnel. Friday they found steam and water coming from a dime-sized hole in a drainage pipe.

The water coming from the pipe gets collected in a sump drain and doesn't reach the environment.

Smith said workers also are preparing to install a new groundwater monitoring well early this week. No detectable levels of radioactive tritium have been found in samples taken from drinking water wells or the nearby Connecticut River.



Follow us on Facebook and Twitter.





READER COMMENTS

No comments.

You must be logged in to leave a comment. Register | Log In

Logout